At a glance
Construction site security in Lurgan
Coast Data Security supplies construction site security around Lurgan and the wider Craigavon area, with CCTV towers set up to cover busy logistics yards off the M1 as well as quieter orchard and housing plots. Detection cameras are viewable remotely, solar power covers sites with no mains connection, and hire runs weekly or monthly as work progresses.
What we deploy
Built for a town on the M1 corridor.
Lurgan's position within the Craigavon urban area puts a lot of the sites we cover close to the motorway, on the Kernan and Tavanagh industrial estates, where deliveries move through a compound regularly rather than the ground sitting untouched between visits. That kind of site benefits from a tower with wide detection across the whole yard, since materials and vehicles are in motion for most of the working week, and remote monitoring lets a site manager keep an eye on it without a special trip.
Away from the motorway, on smaller lanes leading out towards the apple growing land the district is known for, sites are more isolated and usually start with no mains power at all. A solar tower is the standard answer there, and it moves with the compound as work advances. In the older parts of town, near Union Street and the linen mill buildings, refurbishment jobs tend to be smaller, where a single tower or a temporary alarm on the cabin is normally enough.
- Wide detection towers for busy logistics and estate yards
- Solar power for orchard and rural plots off the grid
- Temporary alarms for cabins, sheds and stores
- Positioned on the compound gate and the delivery route
- Hired weekly or monthly, moved as the job runs on
Local considerations
How Craigavon's geography shapes the setup.
Armagh City, Banbridge and Craigavon Borough Council covers Lurgan, and the town's place within the wider Craigavon urban area means industrial and logistics work here often runs to a tighter schedule than a rural job elsewhere in the district, with materials moving through the compound rather than sitting still. A tower on the gate covers both that through traffic and anything left overnight once deliveries stop.
Out on the orchard land and the narrower lanes around Lurgan, the picture reverses: a single access track, little passing traffic once work ends for the day, and a compound that relies almost entirely on the tower's own detection. Because Lurgan sits close to the M1, equipment reaches either kind of site, motorway estate or rural lane, without much delay.
Booking site security in Lurgan
From first call to the tower running
- 1
Share the details
Send over the Lurgan site address, your programme dates and whatever you know about power on site. We use this to work out what the compound actually needs.
- 2
We put a spec together
A written quote covers the number of towers, whether solar or mains power fits better, and whether a cabin or shed also needs a temporary alarm fitted.
- 3
Kit arrives and goes up
Towers and alarms are positioned on the compound gate and the materials store, connected for remote viewing and checked over before our team heads off.
- 4
Hire runs through the build
Charges are weekly or monthly for however long the Lurgan job takes, and equipment is repositioned if the compound layout changes partway through.
- 5
Move on or wind down
We collect everything once the site is finished and permanent security has taken over, or carry it straight to your next Lurgan job.
Lurgan site patterns
What we typically fit on a Lurgan site
The final setup depends on the site visit, but these combinations come up often around Lurgan.
| Site type | Typical setup | Power option |
|---|---|---|
| Logistics unit on the Kernan or Tavanagh estate | Wide detection tower on the yard and delivery route | Mains where the estate unit is already connected |
| Orchard or agricultural building off a rural lane | Single tower covering the compound and access lane | Solar, most orchard sites start with no power |
| Housing plots on the edge of town | Camera repositioned from plot to plot | Solar power through the early phases |
| Site close to the M1 junction | Tower on the yard and delivery compound | Mains or solar depending on the phase |
| Refurbishment near Union Street or the linen mill quarter | Temporary alarm on the cabin, tower if the plot is exposed | Mains from the existing building |
More in Lurgan and nearby
Other security work we do in Lurgan
Everything below is installed by the same team, covering the site and the finished building.